Saturday (05/9th) - Today in the afternoon the team made some adjustments in the second level of the arm, as structures for positioning and instação of "nylon bushings for bearing" for articulções. This week we take a considerable advance in the mechanical part of the project. We follow this Ritimo and if possible as soon as possible to expedite the completion of the mechanical. We found that although many small details are lost in a long time to resolve a few screws and nuts to finish the "nylon bushings for the joints, especially the structure of the claw with the marriage of gears and gear spacing that these should have the structure of which spans fixed. Well .. ai vai a picture of the physical part of the project, it emphasized that the 3rd level of the arm (claw) has not yet started, just cut the structures and we hurricanes to be established to 2nd level.