Saturday (05/9th) - Today in the afternoon the team made some adjustments in the second level of the arm, as structures for positioning and instação of "nylon bushings for bearing" for articulções. This week we take a considerable advance in the mechanical part of the project. We follow this Ritimo and if possible as soon as possible to expedite the completion of the mechanical. We found that although many small details are lost in a long time to resolve a few screws and nuts to finish the "nylon bushings for the joints, especially the structure of the claw with the marriage of gears and gear spacing that these should have the structure of which spans fixed. Well .. ai vai a picture of the physical part of the project, it emphasized that the 3rd level of the arm (claw) has not yet started, just cut the structures and we hurricanes to be established to 2nd level.
domingo, 10 de maio de 2009
terça-feira, 5 de maio de 2009
Advance in the mechanical
Tuesday (05/5th) - Today we make more progress in some of the mechanical arm. Already built support for the engine continued on the structure and perform the cutting of the screw worm in the sizes needed. The arm is already assuming a similar way to the final design, as shown in new pictures posted.
domingo, 3 de maio de 2009
Mechanical ...
Saturday (05/2nd ) - Today in the afternoon we meet at home to try to say that something of the mechanical part. Among some hurricanes and some of the structures we build marks the first level of the arm as well as settings for the axis of support. Still many adjustments, but this week will not be the best because of the ratings and the short time for the project. Below are some photos.






Assinar:
Comentários (Atom)